TCH seal
TCH Laboratory — QMS Dashboard
Tarangnan Community Hospital · Quality Management System integrated with LUIB (read-only)
4
Notices
At a glance: 0 of 100 controlled documents approved (all V0 drafts) · 5 of 11 register indicators computable from this snapshot · visual library: 18 bench cards, 27 infographics, 29 flowcharts.
Snapshot freshness: Snapshot is 0 days old — within the weekly refresh cycle. (File: luib_snapshot.db, dated 2026-10-24 08:42)
Data source: this dashboard reads a snapshot — a copy of a LUIB backup file (see Snapshot freshness above), refreshed weekly. It is NOT the live clinical database and nothing here writes to LUIB. QMS document data is real: parsed from the actual MASTER-DOCUMENT-INDEX and the bundled document copies. All figures are computed live from the snapshot by this page.
Opened from LUIB? This dashboard runs in its own browser tab/window. To return to LUIB, close this tab or switch back to the LUIB window — nothing here writes to LUIB, and closing this page does not affect it.
Home / Documents / F-QM-003-B-V0

F-QM-003-B-V0 — Continuous Quality Improvement (CQI) Project Charter and Committee Minutes

Type: Form · Version: V0 · Status: DRAFT — UNAPPROVED · Served read-only from the bundled QMS copies. The Drive master is untouched.

Parent document: LAB-QM-003 — Continual Improvement, Quality Indicators, and Performance Improvement Program Policy (parent is encoded in the form number)

Rendered in-browser from the project's Word file F-QM-003-B-V0-cqi-project-charter-and-committee-minutes.docx (policies-docx / forms-docx — the file Junry reviews). Formatting is faithful, not pixel-perfect; the DOCX is the official copy.

Document #F-QM-003-B-V0Parent DocumentLAB-QM-003 — Continual Improvement and Performance Improvement Program Policy

---

# SECTION A — CQI PROJECT CHARTER

Part 1 — Project Overview

ItemDetails
Project Title
Project Charter No.CQI-C-YYYY-____
Date InitiatedYYYY-MM-DD
Target Completion DateYYYY-MM-DD
Project Lead / Owner
Project Team Members

Part 2 — Problem Statement, Objectives, and Scope

SectionNarrative
Problem StatementDescribe the specific process gap, error frequency, or turnaround delay identified.
Project Goal / TargetSpecific, measurable target (e.g. reduce hemolysis rate below 1.0% within 90 days).
Scope & BoundariesProcesses, wards, and technical sections included and excluded.

Part 3 — Action Plan and Methodology (PDCA Cycle)

PhasePlanned Actions & InterventionsLead PersonTarget DateStatus
Plan (P)Data collection plan, baseline audit, and root-cause analysis[ ] Done
Do (D)Pilot the workflow or procedure change[ ] Done
Check (C)Post-intervention measurement, audit, and baseline comparison[ ] Done
Act (A)Add the change to the SOP and train staff[ ] Done

Part 4 — Results, Verification, and Formal Closure

Evaluation ItemDetails
Baseline Metric vs Post-Intervention MetricBaseline: ___________________ Post-Intervention: ___________________
Was the Project Target Achieved?[ ] Yes [ ] Partially [ ] No
Lessons Learned & Standardization Actions
Project Lead Signature & DateSignature: _________________________________ Date: _________________
CQI Committee Chair Approval & ClosureSignature: _________________________________ Date: _________________

---

# SECTION B — CQI COMMITTEE MINUTES

Part 1 — Meeting Details and Attendance

ItemDetails
Meeting Quarter & Date[ ] Q1 [ ] Q2 [ ] Q3 [ ] Q4
Time & VenueTime: HH:MM
Committee ChairPathologist: _______________________________ [ ] Present [ ] Absent
Committee SecretaryChief Medical Technologist / LQM: _________ [ ] Present [ ] Absent
Medical Technologist Representative___________________________________________ [ ] Present [ ] Absent
Nursing / Ward Representative___________________________________________ [ ] Present [ ] Absent
Other Attendees / Guests

Part 2 — Agenda and Discussion Summary

Agenda ItemDiscussion Summary & Findings
1. Review of Previous Minutes & Matters Arising
2. Quality Indicator Trends (F-QM-003-A-V0)
3. Occurrence, Deviation & Complaint Trends
4. Ongoing CQI Studies & Charters Progress
5. New Quality Improvement Opportunities

Part 3 — Decisions and Assigned Action Items

Item No.Description of Action / Project AssignedResponsible PersonTarget Completion DateFollow-up Status
1[ ] Open [ ] Closed
2[ ] Open [ ] Closed
3[ ] Open [ ] Closed
4[ ] Open [ ] Closed

Part 4 — Verification and Sign-Off

RoleNameSignatureDate
Secretary: Chief Medical Technologist / LQMJunry, RMT
Chair: Pathologist / Head of Laboratory