TCH seal
TCH Laboratory — QMS Dashboard
Tarangnan Community Hospital · Quality Management System integrated with LUIB (read-only)
4
Notices
At a glance: 0 of 100 controlled documents approved (all V0 drafts) · 5 of 11 register indicators computable from this snapshot · visual library: 18 bench cards, 27 infographics, 29 flowcharts.
Snapshot freshness: Snapshot is 0 days old — within the weekly refresh cycle. (File: luib_snapshot.db, dated 2026-10-24 08:42)
Data source: this dashboard reads a snapshot — a copy of a LUIB backup file (see Snapshot freshness above), refreshed weekly. It is NOT the live clinical database and nothing here writes to LUIB. QMS document data is real: parsed from the actual MASTER-DOCUMENT-INDEX and the bundled document copies. All figures are computed live from the snapshot by this page.
Opened from LUIB? This dashboard runs in its own browser tab/window. To return to LUIB, close this tab or switch back to the LUIB window — nothing here writes to LUIB, and closing this page does not affect it.
Home / Documents / F-QM-003-A-V0

F-QM-003-A-V0 — Quality Indicator Register, CQI Schedule, and Performance Improvement Log

Type: Form · Version: V0 · Status: DRAFT — UNAPPROVED · Served read-only from the bundled QMS copies. The Drive master is untouched.

Parent document: LAB-QM-003 — Continual Improvement, Quality Indicators, and Performance Improvement Program Policy (parent is encoded in the form number)

Rendered in-browser from the project's Word file F-QM-003-A-V0-quality-indicator-register-and-performance-improvement-log.docx (policies-docx / forms-docx — the file Junry reviews). Formatting is faithful, not pixel-perfect; the DOCX is the official copy.

Document #F-QM-003-A-V0Parent DocumentLAB-QM-003 — Continual Improvement and Performance Improvement Program Policy

---

Part 1 — Quality Indicator Specifications Table (Planning Elements per LAB-QM-003)

Register of approved quality indicators, their specifications, monthly monitoring metrics, and targets:

Indicator IDQuality Indicator TitlePhase (Pre / Exam / Post)Quality Objective Relates ToNumerator & Denominator DefinitionCalculation Method / UnitData SourceTarget / Threshold LimitMonitoring FrequencyProcess Owner
QI-PRE-01Specimen Rejection RatePre-AnalyticalReduce pre-analytical specimen collection errorsN: Total rejected specimens; D: Total accessions received(N / D) x 100 (%)F-QM-PRE-003-A-V0Target < 1.0%MonthlyMedical Technologist (Receiving)
QI-PRE-02Request Form / Labeling CompletenessPre-AnalyticalEnsure 100% positive patient and test identificationN: Incorrectly labeled or identified requests; D: Total requests(N / D) x 100 (%)F-QM-PRE-003-A-V0Target < 0.5%MonthlyMedical Technologist (Phlebotomy)
QI-ANA-01PT / EQAP Acceptable Performance RateExaminationMaintain technical competency and analytical accuracyN: Satisfactory PT results; D: Total PT challenges evaluated(N / D) x 100 (%)F-QM-ANA-004-A-V0Target 100% (Min 80%)Per Survey Event / AnnualChief Medical Technologist
QI-ANA-02Internal QC Failure / Out-of-Control RateExaminationEnsure analytical precision and run stabilityN: QC runs exceeding 1-3s or 2-2s limits; D: Total QC runs(N / D) x 100 (%)Sectional QC LogsTarget < 2.0%MonthlyMedical Technologists (Bench)
QI-ANA-03Equipment DowntimeExaminationMonitor equipment availability and out-of-service timeTotal equipment out-of-service time recorded for the monthHours per month (trending)Equipment downtime log / LISTrending — target to be setMonthlyMedical Technologists (Bench)
QI-POST-01Routine Test Turnaround Time (TAT)Post-AnalyticalTimely delivery of outpatient and inpatient resultsN: Routine tests meeting stated TAT; D: Total routine tests(N / D) x 100 (%)Lab-LIS / Daily WorksheetsTarget >= 95%MonthlyChief Medical Technologist
QI-POST-02STAT Test TAT CompliancePost-AnalyticalImmediate release of emergency diagnostic testsN: STAT tests released within 60 min; D: Total STAT tests(N / D) x 100 (%)F-QM-POST-003-A-V0Target >= 98%MonthlyChief Medical Technologist
QI-POST-03Critical Values Notification CompliancePost-AnalyticalUrgent physician phone notification within 15 minN: Critical values called within 15 min; D: Total critical values(N / D) x 100 (%)F-QM-POST-002-A-V0Target 100%MonthlyMedical Technologists (Testing)
QI-POST-04Corrected / Amended Report RatePost-AnalyticalEnsure clinical report accuracy and integrityN: Corrected / amended reports; D: Total reports issued(N / D) x 100 (%)F-QM-POST-001-A-V0Target < 0.2%MonthlyChief Medical Technologist
QI-GEN-01Customer & Patient Satisfaction RateGeneral QMSContinual service and customer satisfactionN: Positive satisfaction ratings; D: Total survey responses(N / D) x 100 (%)F-QM-004-A-V0Target >= 90%Quarterly / AnnualChief Medical Technologist
QI-GEN-02Monthly Test Volume & WorkloadGeneral QMSTrack workload for staffing and capacity planningTotal tests performed in the monthCountLab-LISTrending only — no targetMonthlyChief Medical Technologist

---

Part 2 — Monthly Performance Tracking and Improvement Actions Log

Monitoring Period (Month/Year)Indicator IDActual Result / RateTarget Met? (Y/N)Analysis / Variance ExplanationCorrective / Performance Improvement ActionResponsible PersonTarget Completion DateFollow-up Status
[ ] Open [ ] Closed
[ ] Open [ ] Closed
[ ] Open [ ] Closed
[ ] Open [ ] Closed
[ ] Open [ ] Closed
[ ] Open [ ] Closed

---

Part 3 — Annual CQI Study Matrix & Priority Schedule

Planned clinical and operational CQI studies scheduled across quarters per LAB-QM-003 Section 5.4:

Study No.CQI Study Title / Problem StatementPriority / RationaleLead InvestigatorMethodology / Data SourceTarget Sample Size / ScopeScheduled QuarterTarget CompletionProgress StatusOutcome / Project Charter Ref
CQI-2026-01Reduction of Pre-analytical Hemolysis in ER Blood DrawsElevated hemolysis rate observed in emergency specimensMedical Technologist RepHemolysis tracking logAll ER blood specimens over 60 daysQ1–Q2June 30OngoingCharter # CQI-C-01
CQI-2026-02Optimization of CBC Turnaround Time during Outpatient RushOutpatient release delay between 09:00–11:00 peak hoursCMT / LQMLIS timestamp audit200 consecutive outpatient CBC requestsQ3September 30PlannedCharter # CQI-C-02
CQI-2026-03Patient Adherence to Clean-Catch Midstream Urine InstructionsContaminated urinalysis specimens from outpatient clinicNursing RepPatient interview & repeat sample audit100 consecutive routine urinalysis patientsQ4December 15PlannedCharter # CQI-C-03

---

Part 4 — Annual Review & Concurrence Sign-Off

RoleNameSignatureDate
Maintained by: Chief Medical Technologist / Laboratory Quality ManagerJunry, RMT
Reviewed & Approved by: Pathologist / CQI Chair