TCH seal
TCH Laboratory — QMS Dashboard
Tarangnan Community Hospital · Quality Management System integrated with LUIB (read-only)
4
Notices
At a glance: 0 of 100 controlled documents approved (all V0 drafts) · 5 of 11 register indicators computable from this snapshot · visual library: 18 bench cards, 27 infographics, 29 flowcharts.
Snapshot freshness: Snapshot is 0 days old — within the weekly refresh cycle. (File: luib_snapshot.db, dated 2026-10-24 08:42)
Data source: this dashboard reads a snapshot — a copy of a LUIB backup file (see Snapshot freshness above), refreshed weekly. It is NOT the live clinical database and nothing here writes to LUIB. QMS document data is real: parsed from the actual MASTER-DOCUMENT-INDEX and the bundled document copies. All figures are computed live from the snapshot by this page.
Opened from LUIB? This dashboard runs in its own browser tab/window. To return to LUIB, close this tab or switch back to the LUIB window — nothing here writes to LUIB, and closing this page does not affect it.
Home / Documents / F-C-002-A-V0

F-C-002-A-V0 — Mindray BS-240 Clinical Chemistry Analyzer Maintenance Checklist

Type: Form · Version: V0 · Status: DRAFT — UNAPPROVED · Served read-only from the bundled QMS copies. The Drive master is untouched.

Parent document: SOP-C-002 — Mindray BS-240 Clinical Chemistry Analyzer Operation, Calibration, and Maintenance SOP (parent is encoded in the form number)

Rendered in-browser from the project's Word file F-C-002-A-V0-mindray-bs-240-maintenance-checklist.docx (policies-docx / forms-docx — the file Junry reviews). Formatting is faithful, not pixel-perfect; the DOCX is the official copy.

Document #F-C-002-A-V0Parent DocumentSOP-C-002 — Mindray BS-240 Clinical Chemistry Analyzer Operation, Calibration, and Maintenance SOP

(Markdown mirror of the controlled DOCX. In the DOCX this renders as a landscape one-page form with the TCH official header/logo.)

TCH header block (as laid out in the DOCX)
LeftTCH logo
CenterTARANGNAN COMMUNITY HOSPITAL — Tarangnan, Samar — Rizal Street, Brgy. Poblacion B, Tarangnan Samar 6704 — Email: [email protected] — Contact: 0975-814-9224 — LABORATORY DEPARTMENT
RightMINDRAY BS-240 CLINICAL CHEMISTRY ANALYZER MAINTENANCE CHECKLIST

Document control

Document #F-C-002-A-V0Parent DocumentSOP-C-002 — Mindray BS-240 Clinical Chemistry Analyzer Operation, Calibration, and Maintenance SOP
Effective Date________________Month / Year________________
Equipment / Serial No.Mindray BS-240 / __________________SectionClinical Chemistry

DAILY MAINTENANCE — RECORD INITIAL / ✓ IN THE APPLICABLE DAY COLUMN

DAILY CHECK12345678910111213141516171819202122232425262728293031
1. Check sample/reagent probe, mixer, and wash well (Utility > Maintenance > Daily Check)
2. Check DI water tank level and tubing connection
3. Check diluted wash solution tank and tubing connection
4. Check high/low concentration waste container connection
5. Check probe wash solution volume (position D1/40)
6. Check sample/reagent syringe for leaks or air bubbles
7. Run Shutdown wash (Special Wash) at end of shift
TECH. INITIAL

WEEKLY / MONTHLY / SCHEDULED MAINTENANCE AND AUTHORIZED SERVICE

WEEKLY MAINTENANCE

Weekly Maintenance ItemWeek 1 Date / InitWeek 2 Date / InitWeek 3 Date / InitWeek 4 Date / InitWeek 5 Date / Init
1. Clean probe exterior with 75% ethanol gauze followed by DI water gauze
2. Clean mixer paddle exterior with 75% ethanol gauze followed by DI water gauze
3. Execute Special Wash with concentrated wash solution (CD80 / sodium hypochlorite)
4. Execute Cuvette Check (Utility > Maintenance > Check > Cuvette Check)

MONTHLY MAINTENANCE

Maintenance itemDone byDateStatus / Lamp Energy
1. Clean probe and mixer wash wells
2. Clean auto-wash station probes
3. Clean sample/reagent barcode reader window
4. Peristaltic pump calibration
5. Air bubble detector calibration
6. Photometer Check (Utility > Maintenance > Check > Photometer Check 340–670 nm)

3-MONTH / 6-MONTH / AS-NEEDED MAINTENANCE

Maintenance / Check ItemScheduled FrequencyDate CompletedDone by (MT)Findings / Status
Clean deionized water tank thoroughly with 0.5% bleach, rinseEvery 3 Months
Clean diluted alkaline wash solution tankEvery 3 Months
Inspect and replace deionized water filter coreEvery 3 Months
Unclog / clean probe interior with wash stylus wireAs Needed
Clean sample / reagent rotors and wash compartmentsAs Needed
Purge syringe air bubbles / replace syringe plunger tipAs Needed
Replace halogen tungsten lamp (12V / 20W) and execute recalibrationAs Needed / 6 Months

SERVICE ENGINEER / AUTHORIZED SERVICE

Service activityDateEngineer Name / AgencyReference / Report No.Verification QC Status
Preventive maintenance inspection — semi-annual / annual
Service-level calibration / optical alignment
Service report / reference recorded in equipment file
Post-service calibration and QC verification before return to clinical testing
Return-to-service authorization documented

Month-end review

Month-end reviewCompleted By (MT)DateReviewed By CMT/LQMDateService Reference / Notes

Footer lines (as printed on the form)

ABNORMAL FINDINGS / CORRECTIVE ACTION: Record important findings and actions here. Cross-reference the related record when needed.

Controlled record: Complete the applicable day/occurrence entry. Follow the current Mindray BS-240 Operator's Manual and SOP-C-002.