Tarangnan Community Hospital — Clinical Laboratory
When the System Goes Down
LIS and power downtime — manual reporting and recovery (LAB-QM-IT-002 Figure 1).
INFOGRAPHIC IG-19
Source: LAB-QM-IT-002
Version V0 — DRAFT
1 · It happens — declare it
The trigger:
power fails beyond the battery capacity of the UPS
, or the
computer cannot be booted
.
Immediately inform the Chief Medical Technologist.
Notify inpatient nursing stations
that manual reporting is active.
Primary analyzers
continue running on emergency generator power
.
2 · Work on paper — log everything
Samples are received using
standard paper requisition slips
with full patient identifiers —
two identifiers
.
Every manual report issued is logged on F-QM-IT-002-A-V0.
Critical values are reported verbally with read-back
and documented on the downtime log.
3 · Recovery — prove it matches
Power or computer restored?
Verify system stability
before starting retrospective LIS entry (back-encoding).
Enter
all tests logged on F-QM-IT-002-A-V0
into the electronic Lab-LIS.
A
second technologist cross-checks
the electronic entries against the paper originals.
Close out the downtime event only when transcription accuracy is verified with
no unresolved discrepancies
.
Power / LIS fails
→
Inform the CMT
→
Manual reporting — log all
→
Restore + back-encode
→
Second-person check